中文 · English

← Evidence index

github.com/alpha-park/genpark-task-dag-critical-path-scheduler-skill

incomplete Threshold medium · generated 2026-10-05T00:17:46.464Z

Publisher: alpha-park

Packages: (none)
Repository: https://github.com/alpha-park/genpark-task-dag-critical-path-scheduler-skill

How this record was produced

The inputs are public: the registry record and the manifest of the package that was actually published. Each finding below includes its file and rule.

Repository source is outside this index’s scan scope. Use the CLI locally for source scanning; source code does not need to leave your machine.

A finding is a matched shape, not a conclusion. It does not by itself prove exploitability or intent. Findings below the configured threshold do not change the verdict. Unmeasured work is listed separately; unmeasured does not mean clean.

repositoryMetadata

status=findings · source=github-census

RuleSeverityLocationDescription
repository-license-missingmediumno license is declared, so the terms under which this code may be used are unknown

Unmeasured work

This record has no unmeasured blocks.

Scan coverage

State: incomplete · required 3, completed 1, failed 2

ScannerRequiredStatusOutputConsistencyReason
repositoryMetadataRequiredcompletedPresent / parseableok
packageManifestRequiredskippedAbsent / not parseableunverifiedmanifest-found-not-inspected
repositorySourceRequiredskippedAbsent / not parseableunverifiedsource-not-read

Machine-readable record

JSON:
https://xn--5kvo87g.com/v1/servers/github.com%2Falpha-park%2Fgenpark-task-dag-critical-path-scheduler-skill

README badge:
https://xn--5kvo87g.com/badge/github.com%2Falpha-park%2Fgenpark-task-dag-critical-path-scheduler-skill.svg