github.com/alphaparkinc/genpark-task-dag-critical-path-scheduler-skill
incomplete Threshold medium · generated 2026-10-05T00:17:46.467Z
Publisher: alphaparkinc
Packages: (none)
Repository: https://github.com/alphaparkinc/genpark-task-dag-critical-path-scheduler-skill
How this record was produced
The inputs are public: the registry record and the manifest of the package that was actually published. Each finding below includes its file and rule.
Repository source is outside this index’s scan scope. Use the CLI locally for source scanning; source code does not need to leave your machine.
A finding is a matched shape, not a conclusion. It does not by itself prove exploitability or intent. Findings below the configured threshold do not change the verdict. Unmeasured work is listed separately; unmeasured does not mean clean.
repositoryMetadata
status=findings · source=github-census
| Rule | Severity | Location | Description |
|---|---|---|---|
| repository-license-missing | medium | no license is declared, so the terms under which this code may be used are unknown |
Unmeasured work
This record has no unmeasured blocks.
Scan coverage
State: incomplete · required 3, completed 1, failed 2
| Scanner | Required | Status | Output | Consistency | Reason |
|---|---|---|---|---|---|
| repositoryMetadata | Required | completed | Present / parseable | ok | |
| packageManifest | Required | skipped | Absent / not parseable | unverified | manifest-found-not-inspected |
| repositorySource | Required | skipped | Absent / not parseable | unverified | source-not-read |
Machine-readable record
JSON:https://xn--5kvo87g.com/v1/servers/github.com%2Falphaparkinc%2Fgenpark-task-dag-critical-path-scheduler-skill
README badge:https://xn--5kvo87g.com/badge/github.com%2Falphaparkinc%2Fgenpark-task-dag-critical-path-scheduler-skill.svg